• <nav id="mqiwi"></nav>
  • <nav id="mqiwi"><tt id="mqiwi"></tt></nav>
  • <nav id="mqiwi"><strong id="mqiwi"></strong></nav>

    Welcome to Bester!

    position:Home > News > Company News

    The company won the bid for the 19-20 years of Hubei Mobile's wired broadband access engineering construction project

    Author: Issuing time:2019-04-11 13:57 Pageviews:

    In March 2019, in the 2019-2020 wired broadband access engineering construction project (second) bidding of China Mobile Hubei Company, our company won the bids for 4 tender sections in Jingzhou, Xiangyang, Jianghan and Qianjiang, with a total amount of 92.37 million, ranking the third.

    China Mobile Hubei Company's 2019-2020 wired broadband access project construction project (the second time), for the 2019-2020 wired broadband access project, it is estimated that 6 million new users will be added, 3 million new ports will be newly built, and about 500,000 optical fibers will be installed The branch box is used for laying 30,000 kilometers of optical cables. Among the 4 bids that our company won, the Jingzhou bid section accounted for 33.28%; the Xiangyang bid section accounted for 33.57%; the Jianghan bid section accounted for 53.20%; the Qianjiang bid section accounted for 100%. The total amount of the winning bid for this project is 92.37 million, which fully reflects the strong implementation ability of China Bester in the Hubei region and the high degree of customer recognition. 

    061509578953.png

    Share to:

    The company won the bid for the 19-20 years of Hubei Mobile's wired broadband access engineering construction project

    In March 2019, in the 2019-2020 wired broadband access engineering construction project (second) bidding of China Mobile Hubei Company, our company won the bids for 4 tender sections in Jingzhou, Xiangyang, Jianghan and Qianjiang, with a total amount of 92.37 million, ranking the third.

    China Mobile Hubei Company's 2019-2020 wired broadband access project construction project (the second time), for the 2019-2020 wired broadband access project, it is estimated that 6 million new users will be added, 3 million new ports will be newly built, and about 500,000 optical fibers will be installed The branch box is used for laying 30,000 kilometers of optical cables. Among the 4 bids that our company won, the Jingzhou bid section accounted for 33.28%; the Xiangyang bid section accounted for 33.57%; the Jianghan bid section accounted for 53.20%; the Qianjiang bid section accounted for 100%. The total amount of the winning bid for this project is 92.37 million, which fully reflects the strong implementation ability of China Bester in the Hubei region and the high degree of customer recognition. 

    061509578953.png

    自拍 四页 日韩欧美,综合 自拍 日韩 欧美,国产中文自拍,先锋自拍日韩 (function(){ var bp = document.createElement('script'); var curProtocol = window.location.protocol.split(':')[0]; if (curProtocol === 'https') { bp.src = 'https://zz.bdstatic.com/linksubmit/push.js'; } else { bp.src = 'http://push.zhanzhang.baidu.com/push.js'; } var s = document.getElementsByTagName("script")[0]; s.parentNode.insertBefore(bp, s); })();