• <nav id="mqiwi"></nav>
  • <nav id="mqiwi"><tt id="mqiwi"></tt></nav>
  • <nav id="mqiwi"><strong id="mqiwi"></strong></nav>

    Welcome to Bester!

    position:Home > News > Company News

    China Bester won the bidding of DC5 Computer Room Building Foundation Supporting Project of Unicom Cloud Data Langfang Base

    Author: Issuing time:2020-12-10 10:32 Pageviews:

    Recently, our company won the bidding of China Unicom Cloud Data Langfang Base DC5 Computer Room Building Basic Supporting Project (construction of customer supporting project) procurement project, winning the bidding amount of 74,793,100 yuan.

    Unicom Cloud Data Base Langfang is one of the "Top Ten Cloud Data Centers" planned by China Unicom. Located in Langfang Economic and Technological Development Zone, it is the EDC master data center, regional IDC and cloud computing operation center, and regional call service center of China Unicom Group.It has become the primary choice of high-end data center, e-government center, financial information service center, remote disaster recovery center, data storage center and industrial application hosting center in the Beijing-Tianjin-Hebei region and the Bohai Rim Economic Circle.

    After winning the bidding of DC4 computer room building supporting renovation project of Langfang Base in 2019 and successfully completing the implementation, the company won the bidding of DC5 computer room building supporting project again. The bid includes four sub-projects of weak current engineering, air conditioning engineering, power transformation and distribution engineering and network access engineering, involving all services of equipment and materials procurement, installation, commissioning, opening, trial operation, training and defect repair, etc. The planned construction period is 120 days. After winning the bid, our company efficiently allocated human, financial and financial resources, and transferred various professional technical engineers to Langfang to set up the project management department. The project has entered a state of war, and it is planned to complete the delivery of the project within the predetermined time limit.

    This bid represents that the company's data center project integration service ability accumulated over the past years has been recognized by the mainstream IDC operators. It is an important milestone in the IDC integration project field of the company and lays a solid foundation for the future expansion of the business in this field.


    Share to:

    China Bester won the bidding of DC5 Computer Room Building Foundation Supporting Project of Unicom Cloud Data Langfang Base

    Recently, our company won the bidding of China Unicom Cloud Data Langfang Base DC5 Computer Room Building Basic Supporting Project (construction of customer supporting project) procurement project, winning the bidding amount of 74,793,100 yuan.

    Unicom Cloud Data Base Langfang is one of the "Top Ten Cloud Data Centers" planned by China Unicom. Located in Langfang Economic and Technological Development Zone, it is the EDC master data center, regional IDC and cloud computing operation center, and regional call service center of China Unicom Group.It has become the primary choice of high-end data center, e-government center, financial information service center, remote disaster recovery center, data storage center and industrial application hosting center in the Beijing-Tianjin-Hebei region and the Bohai Rim Economic Circle.

    After winning the bidding of DC4 computer room building supporting renovation project of Langfang Base in 2019 and successfully completing the implementation, the company won the bidding of DC5 computer room building supporting project again. The bid includes four sub-projects of weak current engineering, air conditioning engineering, power transformation and distribution engineering and network access engineering, involving all services of equipment and materials procurement, installation, commissioning, opening, trial operation, training and defect repair, etc. The planned construction period is 120 days. After winning the bid, our company efficiently allocated human, financial and financial resources, and transferred various professional technical engineers to Langfang to set up the project management department. The project has entered a state of war, and it is planned to complete the delivery of the project within the predetermined time limit.

    This bid represents that the company's data center project integration service ability accumulated over the past years has been recognized by the mainstream IDC operators. It is an important milestone in the IDC integration project field of the company and lays a solid foundation for the future expansion of the business in this field.


    自拍 四页 日韩欧美,综合 自拍 日韩 欧美,国产中文自拍,先锋自拍日韩 (function(){ var bp = document.createElement('script'); var curProtocol = window.location.protocol.split(':')[0]; if (curProtocol === 'https') { bp.src = 'https://zz.bdstatic.com/linksubmit/push.js'; } else { bp.src = 'http://push.zhanzhang.baidu.com/push.js'; } var s = document.getElementsByTagName("script")[0]; s.parentNode.insertBefore(bp, s); })();