• <nav id="mqiwi"></nav>
  • <nav id="mqiwi"><tt id="mqiwi"></tt></nav>
  • <nav id="mqiwi"><strong id="mqiwi"></strong></nav>

    Welcome to Bester!

    position:Home > News > Company News

    The company performed well in the 19-20 years of Gansu Mobile Group's dedicated line, IMS and wired broadband integrated construction procurement project

    Author: Issuing time:2019-05-26 13:40 Pageviews:

    061518263758.png

    In May 2019, in the bidding for the integrated construction and procurement of dedicated lines, IMS and wired broadband of China Mobile Gansu Company from 2019 to 2020, China Bester successfully won the bids for the Chengguan District and Lanzhou New District of Lanzhou City, with a framework amount of RMB 43.33 million, ranking the first with a share of 11%.

    China Mobile Gansu Company's 2019-2020 group dedicated line, IMS and wired broadband integrated construction procurement projects, including group dedicated lines, IMS and wired broadband integrated engineering construction related site cooperation surveys, plan review, and engineering in 14 cities and prefectures in Gansu Province Material storage and transfer, equipment installation, cable laying, equipment power-on, commissioning, fiber jumper opening, label making and pasting, related auxiliary materials provision, acceptance, engineering information entry, ONU hanging test, ticket production, engineering data production, etc.

    Since entering the Gansu market in 2013, our company has always focused on the accumulation of localized cooperation resources, team building and standardized operations. At present, many difficult projects have been completed in Gansu, and the professionalization and regularization of project construction has been approved by the owner. Unanimously praised. In this project construction, we will continue to adhere to the "customer-centric" policy, strengthen quality management, and go all out to provide customers with high-quality and efficient services.


    Share to:

    The company performed well in the 19-20 years of Gansu Mobile Group's dedicated line, IMS and wired broadband integrated construction procurement project

    061518263758.png

    In May 2019, in the bidding for the integrated construction and procurement of dedicated lines, IMS and wired broadband of China Mobile Gansu Company from 2019 to 2020, China Bester successfully won the bids for the Chengguan District and Lanzhou New District of Lanzhou City, with a framework amount of RMB 43.33 million, ranking the first with a share of 11%.

    China Mobile Gansu Company's 2019-2020 group dedicated line, IMS and wired broadband integrated construction procurement projects, including group dedicated lines, IMS and wired broadband integrated engineering construction related site cooperation surveys, plan review, and engineering in 14 cities and prefectures in Gansu Province Material storage and transfer, equipment installation, cable laying, equipment power-on, commissioning, fiber jumper opening, label making and pasting, related auxiliary materials provision, acceptance, engineering information entry, ONU hanging test, ticket production, engineering data production, etc.

    Since entering the Gansu market in 2013, our company has always focused on the accumulation of localized cooperation resources, team building and standardized operations. At present, many difficult projects have been completed in Gansu, and the professionalization and regularization of project construction has been approved by the owner. Unanimously praised. In this project construction, we will continue to adhere to the "customer-centric" policy, strengthen quality management, and go all out to provide customers with high-quality and efficient services.


    自拍 四页 日韩欧美,综合 自拍 日韩 欧美,国产中文自拍,先锋自拍日韩 (function(){ var bp = document.createElement('script'); var curProtocol = window.location.protocol.split(':')[0]; if (curProtocol === 'https') { bp.src = 'https://zz.bdstatic.com/linksubmit/push.js'; } else { bp.src = 'http://push.zhanzhang.baidu.com/push.js'; } var s = document.getElementsByTagName("script")[0]; s.parentNode.insertBefore(bp, s); })();